PIF Logo
 
  HOME
seperator image
  WHO WE ARE
seperator image
  About the PIF
seperator image
  Contact Information
seperator image
  WHAT WE DO
seperator image
  Engineering
seperator image
  Mechanical Fabrication
seperator image
  Integration
seperator image
  Quality Assurance
seperator image
  Project Management
seperator image
  ADDITIONAL INFO
seperator image
  Related Links
seperator image
  Download Library
seperator image
  Success Stories
seperator image
  News & Events
seperator image
  Privacy and Security
seperator image
  Accessibility Info
seperator image
Prototype Integration Facility logo banner Success Stories faded background image
Success Stories faded background image
image
 
Success Stories  


Below are some of our success stories that have been compiled over years of providing solutions to our customers.
Select from the pulldown to go to a specific Success Story:


 
 
1 | 2 | 3 | 4
Next Page >
patriot advanced capability 3 power transfer test analysis image ribbon imagePatriot Advanced Capability 3 Power Transfer Test Analysis
Electronics Simulation & Analysis

Background:
Power Transfer Tests of PAC-3 Missile produced failures during power-up of the seeker power supply
Activities:
• Simulation and analysis of circuitry replicated the problem and confirmed root cause of failure
• Simulation results were used to choose best solution from possible alternatives
• Analysis confirmed the selected solution will prevent recurrence of the problem
Benefits:
• Reduced system risk
• Cost avoidance (identified problem prior to costly hardware build)
horrizontal seperator image
vehicle automated diagnostic system image ribbon imageVehicle Automated Diagnostic System (VADS)
Electronic Design & Fabrication

Background:
• USMC TMDE required general purpose equipment for cross platform testing.
• Leveraging of COTS instrumentation required.

Activities:
• Developed Concept and designed Hardware
• Building Prototypes and Initial Production Units
• Documenting Hardware for Competitive Procurement
• Providing life cycle engineering support

Benefits:
• Multipurpose test platform:
- Provides ambiguity busting of LRU BIT
- Internal Combustion Engine Testing
- Multiple data buses supported (J1939, J1708, J1850)
- Multiple instrumentation capability (DMM, RF, 1553, RS422/232)

• Dual service test platform (Army & USMC)
• Extensive use of COTS hardware
horrizontal seperator image
patriot tactical comand system image ribbon imagePatriot Tactical Command System (TCS)
Electronic Design & Fabrication

Background:
• Replacement for Battalion Tactical Operations Center
• Electronics hardware required for upgrade

Activities:
• Modified Design to Improve Product
• Fabricated Electronics Hardware for both US and FMS Customers
Fielded and Spare hardware Over 700 Cables & 90 Electronic Assemblies
• Documented all hardware in Technical Data Package

Benefits:
• Rapid turn to meet quick fielding
• Cost saving thru In House performance of
SOW
• Teaming with other organizations to provide
turn key solution - - Integrator / Software developer / Prime Contractor
horrizontal seperator image
cic landmines image ribbon imageCIC - Landmines
Stereolithography Rapid Prototyping

Background:
Precise replicas of mines used in foreign countries were needed for training soldiers

Activities:
• Physical 3D models of mines were built from 2D drawings, hand sketches and photographs
• CIC used the master models to build tooling for fabricating thousands of mines for training purposes

Benefits:
• Accurate mine replicas were possible
• Tremendous cost and time savings
• 90% reduction in shipping weight by utilizing vacuum forming
horrizontal seperator image
efogm joysticks image ribbon imageEFOGM Joysticks
Stereolithography Rapid Prototyping

Background:
• New design of gunner’s joystick needed to be tested and implemented

Activities:
• 3-D model of joystick was provided for ergonomic testing
• SLA material properties met design requirements for field use
• 30 models were built and used in the field for actual testing

Benefits:
• Significant cost savings
• Reduced “time to market”

1 | 2 | 3 | 4
Next >
 
About the PIF :: Doing Business with the PIF :: Contact Information :: Engineering :: Mechanical Fabrication :: Integration :: Quality Assurance :: Project Management :: Related Links :: Download Library :: Success Stories :: News & Events :: Privacy and Security :: Accessibility Info

AMCOM and AMRDEC logos