Below
are some of our success stories that have
been compiled over years of providing solutions
to our customers.
Select from the pulldown to go to a specific
Success Story:
|
|
|
 |
Analog
to Digital (A2D) Boxes
Fabrication
(current task)
Scope:
Fabricate 51 A2D boxes
Funding:
$738K (PIF Portion) from TAPO, Ft. Eustis
Team:
SED, PIF, Aviation Eng Dir, RTTC, and
TAPO
Benefits:
A2D Acts as a MIL-STD-1553B Gateway
Interfaces with:
APN-209D Altimeter
ARN-154 TACAN
TAS 2600 Air Data Computer
ARX-300 Emergency Locator
AAQ-16B FLIR
Control and Display Unit 9000 |
|
 |
 |
Spare
Part Fabrication - Support of Aviation
Programs for IMMC
Background:
In the past year, Prototype Engineering
Division has supported IMMC with the
fabrication of spare parts, new parts,
and tools for aviation programs. This
support is provided where procurement
sources no longer exist, low quantities
make procurement difficult and cost
prohibitive, or a quick response is
required.
See
details on this project |
|
 |
 |
Mobile
Tower System (MOTS)
Background:
Army Needed a Quick Deployable, Highly
Mobile Air Traffic
Control Tower For Remote Airfields
Activities:
12 Month Effort Initiated, Teamed
with Redstone Technical Test Center
Potential 6 Year, $36M Program
Design & Qualify MOTS in
Army ATC Configuration
Build 1 prototype MOTS
Integrate ARC 220 & PRC 117s
into Tower
Generate BIT and Hardware control
Software
Integrate 10KW generators on
Trailers
Coordinate EMI, EMC & Road
Testing
Develop Drawing package
|
|
 |
 |
PATRIOT
Battery Command Post
Background:
The PATRIOT Battery Command Post (BCP)
is a replacement for the M109 Van. The
design, fabrication, integration, and
testing of Phase 1 Prototype is complete.
A total of 24 Phase 1 BCPs will be integrated
with 14 already deployed.
Activities:
Phase
1+ Prototype development was initiated
in FY03 with requirement to integrate
41 Phase 1+ BCPs.
|
|
 |
 |
PATRIOT
Batallion Tactical Operations Center
Activities:
The PATRIOT Battalion Tactical Operations
Center (BTOC) was fabricated, integrated,
and tested through a cooperative effort
with the PATRIOT prime and support contractors.
Sixteen units were integrated and fielded
over a 2 year period in our facility.
The
BTOC was later upgraded to the Tactical
Command System (TCS). An additional
upgrade of the TCS is in process.
|
|